Client: Mr. Arun Chandel
Date: January 2024
Time Taken: In progress
Tags: Astha Hospital Mandi, Himachal Pradesh
Work technology: Light Gauge Steel Frame Structure
Project Location: Astha Hospital Mandi, Himachal Pradesh
Area: 10,000 sqft
- Astha Hospital Mandi, Himachal Pradesh
- Mallik Farmhouse Chandigarh
- Proposed G+2 Structure for Model career Centre, MCC Kaza
- Mr. Rajesh Mediratta Farmhouse - Meerut, Uttar Pradesh
- G+1 Rehabilitation Centre Kullu, Himachal Pradesh
- Amritsar, Punjab
- Dwarka, New Delhi
- Chennai, Tamil Nadu
- Hybrid Structure - Palampur, Himachal Pradesh
- Bhawarna, Kangra, Himachal Pradesh
- Dehra, Himachal Pradesh
- Katindi, Mandi, Himachal Pradesh
- Una, Himachal Pradesh
Client: Malik ji
Date: January 2024
Time Taken: In progress
Tags: Malik Farmhouse Chandigarh
Work technology: Light Gauge Steel Frame Structure
Project Location: Shivalik Enclave, Punjab
Area: Ground Floor
Client: **
Date: January 2024
Time Taken: In progress
Tags: Proposed G+2 Structure for Model career Centre, MCC Kaza
Work technology: Light Gauge Steel Frame Structure
Project Location: Kaza, Himachal Pradesh
Area: 8821 sqft
Client: **
Date: January 2024
Time Taken: In progress
Tags: Farmhouse
Work technology: Light Gauge Steel Frame Structure
Project Location: Meerut, Uttar Pradesh
Area: 3880 sqft
Client: **
Date: January 2024
Time Taken: In progress
Tags: G+1 Rehabilitation Centre Kullu, Himachal
Work technology: Light Gauge Steel Frame Structure
Project Location: Amritsar, Punjab
Area: 851 sqft
Client: Sukhmeet Kaur
Date: January 2024
Time Taken: In progress
Tags: **
Work technology: Light Gauge Steel Frame Structure
Project Location: Amritsar, Punjab
Client: Dr. pradyuman
Date: June 2023
Time Taken: In progress
Tags: 11 rooms with toilet
Work technology: LIGHT GAUGE STEEL FRAME STRUCTURE
Project Location: DWARKA DELHI
Client: Spectra Productions Private Limited
Date: July 2023
Time Taken: In progress
Tags: Film Set
Work technology: LIGHT GAUGE STEEL FRAME STRUCTURE
Project Location: Chennai
Client: Mr. Gokul Butel
Date: 19- june-2023
Time Taken: In progress
Tags: * G+1 cafe project *
Work technology: Hybrid Structure(PEB+LIGHT GAUGE STEEL FRAME STRUCTUR)
Project Location: Palampur
Client: ….
Date: ….
Time Taken: under construction Tags: 2 BHK Home, floor extensions
Work technology: Foundation RCC Padding, Prefab Construction in MS structure, GI floor and stud.
Providing and fixing sound proof wall system using frame work of 75mm stud, 50mm glass wool, and 8mm cement board with final finishing of plaster board of 12.5mm. Exterior finishing fiber cement plank. Providing and fixing Aluminim black color door with tough glass of thickness 8mm. install window with DJU glass of thickness 22 mm.
Client: Hoshiar chand (MLA, Dehra)
Date: March 15, 2023
Time Taken: under construction
Tags: 4 cottages
Work technology: Foundation RCC Padding, Prefab Construction in MS structure, GI floor and stud.
Providing and fixing sound proof wall system using frame work of 75mm stud, 50mm glass wool, and 8mm cement board with final finishing of plaster board of 12.5mm. Exterior finishing fiber cement plank. Providing and fixing aluminum black color door with tough glass of thickness 8mm. install window with DJU glass of thickness 22 mm.